4 results
 PNG Conservation and Environment Protection Authority

Ramu Nickel Project Environmental Plan consists of a Guide to the Environmental Plan and three volumes; Volumes A to C. Volume A is an Executive Summary of the Environmental Plan, Volume B consists of the Main Report and Volume C is the Appendices.

 PNG Conservation and Environment Protection Authority

Here we analyze rainfall data for the New Guinea region comprising station observations, reanalysis products and satellite-based estimates in order to better understand some of these details. We find that most gridded products are limited due to their relatively coarse horizontal resolutions that fail to resolve topographic effects. However, the relatively fine resolution TRMM satellite–based product appears to provide reliable estimates and linear correlations between the data and the NINO34 sea surface temperature index provides an insight into the pattern of ENSO rainfall impacts.

 PNG Conservation and Environment Protection Authority

Esso Highlands Limited (Esso) proposes to develop the Papua New Guinea Liquefied Natural Gas Project
(PNG LNG Project) in a co-venture with other participants. Esso (as project operator) will produce and condition gas from new and existing petroleum fields in the Southern Highlands and Western provinces of Papua New Guinea, send the conditioned gas by pipeline across Gulf Province and the Gulf of Papua to a 6.3-Mtpa LNG Plant in Central Province, liquefy the gas, and load it onto LNG carriers for export. The project will also produce condensate for export.

 PNG Conservation and Environment Protection Authority

Environmental Monitor 2002 is designed to provide basic information about PNG's natural resources, pressures affecting these resources and steps which need to take place to ensure PNG's awareness of economic benefits and trade-offs involved between development and sustainability. It is the first in Monitor Series which aim to engage and inform stakeholders of key environmental issues.